Today (Day 1) we are beginning the prep work for the Hot Tub. As I mentioned previously, we got 3 quotes for the prep work. We decided on one guy whom we are still waiting for at the moment. He told us he would be here between 9-10 this morning, it is now after 1. I have a feeling Jeff will continue to do the work himself. It was a nice idea to have someone else do some of the work for us. We can all dream, right?!
Last night Jeff began a little early sanding, removing the pneumatic push button start for the hot tub and cut a hole out to fit the electronic control panel. He removed some of the side paneling to get to the back side of the hot tub and cut a 2 1/2 inch hole in the hot tub for the light. It's going to be a 16 color LED light that we control by the electrical panel.
That was the blog post from January 20, 2023. We took a total of 12 days over the span of a few weeks to complete this Hot Tub Refinishing. Check out our blog at www.ourmoneypit.com to see this and other postings. You will see pictures that you may not see on YouTube @ourmoneypit2535
Last night Jeff began a little early sanding, removing the pneumatic push button start for the hot tub and cut a hole out to fit the electronic control panel. He removed some of the side paneling to get to the back side of the hot tub and cut a 2 1/2 inch hole in the hot tub for the light. It's going to be a 16 color LED light that we control by the electrical panel.
That was the blog post from January 20, 2023. We took a total of 12 days over the span of a few weeks to complete this Hot Tub Refinishing. Check out our blog at www.ourmoneypit.com to see this and other postings. You will see pictures that you may not see on YouTube @ourmoneypit2535
- Category
- Twitch Hot Tub
- Tags
- hot tub renovation, bathroom remodel, house flipping
Commenting disabled.
